Eir coverage map — Towns overview (m2)
Town-level snapshot of Eir fiber and mobile coverage across Irish towns. Independent, map-based notes to help you verify availability before you switch.
- Town-level indicators: Fiber, FTTP, Fixed Wireless, 4G/5G
- Updated: 2026 — aggregated from public coverage maps and on-the-ground checks
- Independent reviews and confirmed reports per town


Interactive coverage map
Pan and zoom the embedded region map for town-level indicators. Use layers to toggle fiber vs mobile signal.
Selected towns — details & notes
Short summaries for frequently-checked towns. Click a town to expand on confirmed coverage type and local notes.

Notes: Several estates show FTTP availability; check premises via Eir address search and confirm with postcode checks.
- Likely: FTTP in new developments
- Common: A mix of DSL and fiber on adjacent streets
- Tip: Use installer visit for precise ONT placement

Notes: 4G/5G mobile coverage is consistently strong. Fiber rollout present in town centre with FTTP build zones moving outward.
- Best areas: Town centre & newer estates
- Watchpoints: Some rural addresses rely on fixed wireless

Notes: Local projects aim to increase FTTP reach; many outlying addresses still depend on fixed wireless or DSL.
- Community updates helpful — check local council notices
- Installation wait times vary
Coverage snapshot by county
Estimated percentage of towns with confirmed fiber availability (sampled towns, independent observations).
| County | Sampled towns | Fiber presence | Notes |
|---|---|---|---|
| Dublin | 12 | 85% | FTTP common in urban areas |
| Cork | 8 | 60% | Mixed; rural gaps exist |
| Galway | 6 | 55% | Town centres prioritized |
| Mayo | 5 | 30% | Many fixed wireless areas |
How to verify and switch — quick checklist
- Use the provider's address check as a first filter.
- Compare independent reports in nearby streets on this site.
- Confirm installation lead times and ONT/engineer requirements.
- Backup: ask about fixed wireless options if fiber not available.
- Keep an eye on local FTTP roll-out announcements.
Independent town reviews & user notes
Confirmed FTTP in new estate; installation completed in 3 weeks.
Share your note
Strong mobile signal; FTTP limited to central streets.
Report an update
FTTP project announced; staging expected in 2026–2027.
More articlesContribute a town report
If you have recent installation experience or a local update, let us know — your notes improve the coverage map for everyone.